|
|
PRE-COOLING
Pre-cooling is immediately done after arrival at our premise to
cool down heated temperature inside the cartons. |
|
|
After
pre-cooling,to read temperature in the cartons to make sure an optimum
temperature is reached. |
|
|
ETHYLENE
MACHINE
To get rid of ethylene gas which damages flowers. |
|
|
COLD
ROOMS
Two different temperature ranges used,depending on the type of flowers. |
|
|
AIR
CONDITIONED SPACE
For labelling of carton |
|
|
SANITATION
Cold rooms and working places are periodically sanitized. This is
basic principle of quality control. |